Project Spotlight - Governor's Mansion
CAUSE
In September of 2010, the private kitchen of the Governor's
Mansion in Harrisburg, Pennsylvania experienced a severe water
leak due to age.
DAMAGE DESCRIPTION
The hardwood flooring in the kitchen became saturated with water causing warping and buckling. The floor was beyond repair and needed to be replaced. The area connected to
a dining room area with the same flooring, therefore the exact flooring had to be matched.
The damage was throughout the kitchen. All lower cabinets, appliances and granite countertops had to be removed before
the flooring could
be installed.
ACTION
Due to the Governor’s schedule, the floor replacement project needed to be completed in 8 days time. ACCORD Restoration received a call from the insurance company and immediately evaluated the situation.
ACCORD took action quickly to secure the correct materials for the job, schedule crews including overtime, and plan the project to meet the deadline.
All lower cabinets, appliances and granite countertops were
reset with care by ACCORD Restoration and in 8 days the
restoration was complete.
ACCORD’S IMPACT ON CLAIM
The floor in the private kitchen of the Governor’s Mansion was restored to its original beauty. The Governor, the executive staff and administrative staff all gave the ACCORD team high praise for the workmanship, coordination, professionalism and speed.
24-Hour Emergency Response
The professionals at ACCORD Restoration
are available 24/7/365 to provide you with timely estimates and
guaranteed completion times. Call 888-277-0651 and our crews can be on-site
in one hour.
ACCORD Restoration gets the job done right the first
time. Our team has extensive experience and has completed advanced training.
You can rest assured that your property is in the hands of the best.